Case Study Ferndale Comprehensive School

2 off Ashwell Green-TEC 150kW wood pellet boilers installed Summer 2008.

The boiler includes large self filling ash bins and a quick flue clean mechanism which allows the boilers flue to be cleaned without opening the boiler doors.

The cleaning takes approximately five minutes per week and can be carried out with the boiler still operating.