Case Study Makita
A 75KW Green-Tec boiler was installed at Makitas new warehouse in Milton Keynes.
The boiler provides localised heating over work areas and the main office area.
<<Back to case studies
Copyright © 2008 Ashwell Engineering Services. All rights reserved. Website designed by www.smdwebsites.co.uk